Jakarta, INTI - Pertamina New & Renewable Energy (Pertamina NRE) is exploring the potential development of offshore wind power in Indonesia. As part of this initiative, Pertamina NRE has signed a memorandum of understanding (MoU) with PT Hywind Energy Solution, marking the first step toward identifying opportunities for offshore wind energy development in the country.
The MoU signing ceremony between Pertamina NRE and Hywind Energy Solution took place at the Embassy of the Kingdom of the Netherlands in Jakarta on Monday, November 23, 2026.
The agreement was signed by Pertamina NRE President Director John Anis and Pronewable Development President Director Hans Rijntalder, and witnessed by Jurgen Bartelink, Head of Economic Affairs at the Netherlands Embassy.
Through the MoU, Pertamina NRE and Hywind Energy Solution agreed to explore potential collaboration in offshore wind power development through feasibility studies covering technical, market, economic, business, environmental, legal, and risk aspects.
The cooperation will also involve exploring strategic, technical, and commercial partnerships, including knowledge exchange and technology utilization.
Pertamina NRE President Director John Anis said the collaboration is expected to create investment opportunities, strengthen the readiness of domestic supporting industries, support energy source diversification, and enhance national energy security.
The partnership exploration is also part of broader efforts to identify and develop Indonesia's potential renewable energy resources.
"Indonesia has diverse renewable energy potential that requires comprehensive assessment to ensure optimal development. Through this collaboration, we aim to explore wind energy opportunities, including in Banyuwangi, by considering technical aspects, economic feasibility, infrastructure readiness, and potential integration into the electricity system," John said in a written statement on Tuesday, November 24, 2026.
The meeting between Pertamina NRE and Hywind Energy Solution also featured presentations on offshore wind power development potential in Indonesia, particularly in the East Java–Bali region.
The presentation was delivered by Robbert Groenen, Consultant & Business Developer for Renewable Energy at Haskoning. Meanwhile, Matthijs de Haan, Project Developer at Pronewable Development, outlined the company's offshore wind power business development strategy.
Banyuwangi Identified as a Potential Offshore Wind Project Location
The presentations also addressed several challenges facing wind energy development in Indonesia, particularly variations in wind speed across different regions, which may not fully meet the operational requirements of wind turbines. As a result, site selection is a critical factor in determining project feasibility.
Based on the preliminary assessment presented, the waters off Banyuwangi in East Java have been identified as one of the potential locations for a pioneering offshore wind power project, with an estimated initial capacity of approximately 200–300 megawatts (MW).
Shipping routes and electricity grid connectivity are also among the factors being considered in assessing the feasibility of the proposed development site.
Hans Rijntalder said the partnership between Pertamina NRE and Hywind Energy Solution represents an initial step toward advancing offshore wind energy development in Indonesia by combining the capabilities of both companies.
Through this collaboration, the two parties aim to leverage their respective experience and expertise in offshore engineering, wind resource assessment, infrastructure development, and project financing.
"We hope that our collaboration with Pertamina NRE will strengthen technological readiness and local supply chains, create investment and green job opportunities, and help establish a sustainable renewable energy industry ecosystem in Indonesia," Hans said.
Conclusion
The partnership between Pertamina NRE and Hywind Energy Solution marks an important step in exploring Indonesia's offshore wind energy potential. With preliminary assessments identifying the waters off Banyuwangi as a potential location for a 200–300 MW project, the collaboration could open opportunities for renewable energy investment, technology development, and stronger local industry participation. Further feasibility studies will be essential to assess the project's technical, economic, and environmental viability while supporting Indonesia's energy diversification and long-term energy security goals.
Read more: Indonesia and China Explore IDR 32.9 Trillion Investment in Coal-to-Ethanol Technology