Search
Select your preferred reading mode:
Ad
3 hours ago |
Jakarta, INTI - PT Bukit Muria Jaya (BMJ), in collaboration with iForte Energi, officially installed a rooftop solar power plant (PLTS) with a total installed capacity of 5.5 MWp located at BMJ's production facilities in Karawang, West Java, and Kudus, Central Java. The PLTS consists of a 5,048 kWp installation at the Karawang facility and a 455 kWp installation at the Kudus facility. Overall, ...
11 hours ago |
Jakarta, INTI - Lippo Malls Indonesia (LMI) is accelerating its clean energy transition by commissioning a rooftop solar photovoltaic (PV) system at Sun Plaza Medan, reinforcing its commitment to environmental, social, and governance (ESG) principles while reducing carbon emissions across its retail portfolio. The new installation is expected to cut annual carbon emissions by up to 729 tons of ...
2 hours ago |
Jakarta, INTI - Chinese battery manufacturer Tianneng Group inaugurates a production operational base in Surabaya, East Java. The production base is expected to supply the growing demand for electric vehicle (EV) batteries in the domestic market and Southeast Asia. Aside from being a center of national industrial activity, Surabaya is considered to have a manufacturing ecosystem, logistics netw...